In large construction and fabrication spaces, overhead/bridge cranes do the heavy lifting—literally. This long-form walkthrough takes you behind the scenes of a mega-project crane install. You’ll see hoist and trolley setup—all explained in clear, real-world language.
Bridge Crane Basics
An overhead crane rides on parallel runways anchored to a building frame, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The system delivers three axes of motion: cross-travel along the bridge.
You’ll find them in fabrication bays, steel plants, power compact wheel loader stations, oil & gas shops, precast yards, and logistics hubs.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Huge efficiency gains.
Repeatable, precise positioning that reduces damage.
Support for pipelines, structural steel, and big machinery installs.
Scope at a Glance
Runways & rails: runway girders with crane rail and clips.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): single- or double-girder configuration.
Trolley & hoist: reeving, hook block, upper limit switches.
Electrics & controls: VFDs, radio remote, pendant.
Stops, bumpers & safety: end stops, buffers, travel limits.
Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The installation flow stays similar, with heavier rigs demanding extra controls and sign-offs.
Make-Ready & Surveys
Good installs start on paper. Key steps:
Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.
Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.
Runway verification: Survey columns and runway beams for straightness, elevation, and span.
Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.
Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.
People & roles: Brief everyone on radio calls and stop-work authority.
Millimeters at the runway become centimeters at full span. Spend time here.
Getting the Path Right
Runway alignment is the foundation. Targets and checks:
Straightness & elevation: Laser or total station to set rail height.
Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.
End stops & buffers: Verify clearances for bumpers at both ends.
Conductor system: Mount conductor bars or festoon track parallel to the rail.
Record as-built readings. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.
Putting the Span in the Air
Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.
Sequence:
Lift end trucks to runway level and set temporarily on blocks.
Rig the bridge girder(s) and make the main lift.
Land the bridge on the end trucks and pin/bolt per GA.
Measure diagonal distances to confirm squareness.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): confirm limit switch wiring. Lock out after test.
The Heart of the Lift
Trolley installation: Mount wheels, align wheel flanges, set side-clearances.
Hoist reeving: Lubricate wire rope; verify dead-end terminations.
Limits & load devices: Set upper/lower limit switches.
Cross-travel adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
Grinding noises mean something’s off—stop and inspect. Don’t mask issues with higher VFD ramps.
Power with Discipline
Power supply: Conductor bars with collectors or a festoon system.
Drive setup: Program VFDs for soft starts, decel ramps, and brake timing.
Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.
Cable management: Keep loops short, add drip loops where needed.
Commissioning crews love clean labeling and clear folders. Photos of terminations help later troubleshooting.
Trust but Verify
Inspection Test Plan (ITP): Third-party witness for critical steps.
Torque logs: Record wrench serials and values.
Level & gauge reports: Attach survey prints.
Motor rotation & phasing: Confirm brake lift timing.
Functional tests: Jog commands, inching speeds, limits, overloads, pendant/remote range.
QA/QC is not paperwork—it’s your warranty in a binder.
Load Testing & Commissioning
Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Limit switches trigger reliably; overload trips; horn/beacon function.
Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.
Only after these pass do you hand over the keys.
Applications & Use Cases
Construction & steel erection: placing beams, trusses, and precast.
Oil & gas & power: moving heavy pumps, skids, and pipe spools.
Steel mills & foundries: hot metal handling (with the right duty class).
Warehousing & logistics: high throughput lanes.
Once teams learn the motions, cycle times drop and safety improves.
Controls that Matter
Rigging discipline: dedicated signaler and stop-work authority.
Lockout/Tagout: clear isolation points for electrical work.
Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.
Runway integrity: no cracked welds, correct bolt grades, proper grout.
Duty class selection: overspec when uncertainty exists.
A perfect lift is the one nobody notices because nothing went wrong.
Keep It Rolling
Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.
Hot gearboxes: adjust brake air gap and reduce VFD decel.
Rope drum spooling: dress rope and reset lower limit.
Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.
Wheel wear & rail pitting: add rail sweeps and check clip torque.
A 10-minute weekly check saves days of downtime later.
Quick Answers
Overhead vs. gantry? Choose per site constraints.
Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.
How long does install take? Scope, bay readiness, and tonnage rule the schedule.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
Why Watch/Read This
If you’re a civil or mechanical engineer, construction manager, shop supervisor, or just a mega-project fan, this deep dive makes the whole process tangible. You’ll see how small alignment wins become big reliability wins.
Looking for a clean handover databook index you can reuse on every project?
Download your pro bundle and cut hours from setup while boosting safety and QA/QC. Save it to your site tablet for quick reference.
...